期刊文献+

钻井连续循环系统上卸扣卡瓦卡紧力分析 被引量:3

CLAMPING FORCE ANALYSIS FOR ON/OFF SLIP OF CONTINUOUS-CIRCULATION SYSTEM
下载PDF
导出
摘要 从钻井连续循环系统上卸扣卡瓦的工作机理入手,弄清了钻杆工作时的受力状态。将钻杆看作厚壁筒,采用弹性力学中的拉美公式求解钻杆内外受压的应力问题。钻杆外表面承受的摩擦力矩,看作圆筒扭转问题进行求解。考虑管壁的变形的影响,解决了钻井连续循环系统上卸扣卡瓦卡紧力的计算难题,给出了上卸扣卡瓦卡紧力的计算公式。实例计算表明采用Φ127或Φ140钻杆进行连续循环钻井,上卸扣卡瓦卡紧力最好取19MPa;为提高钻杆的安全系数,应尽量采用厚壁钻杆;在卡瓦的设计时,可考虑加大卡瓦长度的方法减小卡瓦卡紧钻杆时的卡紧力。该计算方法可以用于指导钻井连续循环系统上卸扣卡瓦的设计。 Based on the operational principle of on/off slip of continuous-circulation system,the forced state of drill pipe was clarified.Taking the drill pipe as thick-walled cylinder,the stress of internal and external compressed was solved with the Lame equation.The friction torque of drill pipe outer surface was calculated with cylinder torsion methods.Considering the deformation of drill pipe,the clamping force calculation formula of on/off slip of continuous-circulation system was given.Analysis of an example has showed that the clamping force was 19MPa when the 5″or 51/2″drill pipe was used,and the thick-walled drill pipe should be used to ensure safety,and the length of on/off slip could be increased to decrease the clamping force,which could be used to guide the design of on/off slip.
出处 《钻采工艺》 CAS 北大核心 2009年第6期72-74,81,共4页 Drilling & Production Technology
基金 国家自然科学基金项目"基于钻井系统动力学的井眼轨迹预测理论及控制方法研究"(编号:50474040) 中国石油化工集团公司先导性项目"钻柱连续循环系统技术研究"(编号:P07044)
关键词 连续循环系统 上卸扣卡瓦 卡紧力 钻杆 分析 continuous-circulation system,on/off slip,clamping force,drill pipe,analysis
  • 相关文献

参考文献9

  • 1Brugman J D , SPE, and R.E. Vogel, SPE, Natl. Oilwell Varco; and Jenner J W, The continuous circulation system--from prototype to commercial tool [ C ]. SPE 102851, 2006.
  • 2Calderoni A SPE, Vogle R E, SPE, Varco Natil. , Jenner J W, SPE etc. Balanced pressure drilling with continuous circulation using jointed drill pipe - case history, Port Fouad Marine Deep: Exploration Well Offshore Egypt [C]. SPE 102859, 2006.
  • 3Jenner J W, Elkins H L, Springett F etc. The continuous -circulation system: an advance in constant -pressure drilling[ C]. SPE 90702 - PA, 2005.
  • 4朱海燕,刘清友,莫丽,肖晓华.钻杆卡瓦牙板齿齿形设计[J].石油机械,2008,36(11):68-70. 被引量:17
  • 5王锡洲,王洪兵,肖利君,朱海燕,刘清友,莫丽,韩传军.连续循环系统上卸扣卡瓦卡紧力计算方法研究[J].石油矿场机械,2009,38(10):35-39. 被引量:11
  • 6Matthew D. M. Managed pressure drilling techniques and tools [ M ]. MS thesis, 2006.
  • 7Ayling L J, Jenner J W, Elkins H. Continuous circulation drilling [ J ]. PTC, Drilling Technology, OTC 14269, February 2003.
  • 8Tool Pusher's Manual. 9th Edition. API Drill- Pipe Standards [ A]. Care and Handling Section B - 3. Washington D C: API Publication, 1981.
  • 9林军,伍开松.闸板防喷器胶芯密封参数算法及结构优化[J].石油学报,1997,18(1):123-128. 被引量:9

二级参考文献20

  • 1李桐,马庆贤,崔奋.封隔器卡瓦咬合过程受力模拟研究[J].石油矿场机械,2004,33(B08):11-13. 被引量:17
  • 2龚伟安.卡瓦内悬挂管柱的理论承载能力[J].石油矿场机械,1982,11(5).
  • 3胡恩杰.钻井吊钳牙扳齿形的对比[J].石油机械,1985,13(6):21-22.
  • 4徐芝纶.弹性力学.北京:高等教育出版社,2005.
  • 5Brugman J D, Vogel R E,Jenner J W. The continuous circulation system-from prototype to commercial tool [C]. SPE 102851, 2006.
  • 6Calderoni A, Vogel R E, Jenner J W, et al. Balanced pressure drilling with continuous circulation using jointed drill pipe-case history, Port Fouad Marine Deep: Exploration Well Offshore Egypt[C]. SPE 102859, 2006.
  • 7Jenner J W, Elkins H L,Springett F, et al. The contin-uous-circulation system: an advance in constant-pres sure drilling[C]. SPE 90702-PA, 2005.
  • 8Rod Vogel. National oilwell Varco. Continuous circulation system debuts with commercial successes offshore Egypt, Norway [J]. Drilling Contractor, 2006 (11) :27-30.
  • 9Ayling L J, Jenner J W, Elkins H. Continuous circulation drilling[J].Drilling Technology,2003(2): 14 269- 14 271.
  • 10SpiriWH ReinholdWB.卡瓦损伤钻杆机理.石油机械,1982,10(5):53-58.

共引文献33

同被引文献28

  • 1张绪祥.一种摩擦系数计算方法[J].机械设计与制造,2006(1):44-45. 被引量:8
  • 2Calderoni A, Girola G. ENBD, the proprietary eni man- aged pressure drilling with uninterrupted mud circulation: technical update after the first year' s activity [ R ]. IPTC 13867, 2009.
  • 3Molaschi C, Masi S, Zausa F, et al. Near balance drill- ing benefits addressed through a blowout probability model [R]. SPE 156911, 2012. .
  • 4Calderoni A, Masi S, Repetto C, et al. Managing pres- sure drilling with continous circulation, a summary of eni experience[ R]. SPE 147147. 2011.
  • 5Torsvoll A, Horsrud P, Reimers N, et al. Continuous Cir- culation during drilling utilizing a drilling integrated valve - the continuous circulation valve [ R ]. SPE98947. 2006.
  • 6Calderoni A, Girola G, Maestrami M, et al. Microfiux control and E - CD continuous circulation valves allow op- erator to reach HPHT reservoirs for the first time[ R]. SPE 122270. 2009.
  • 7Jenner J W, Elkins H L, Springett F, et 81. The continu- ous circulation system: an advance in constant pressure drilling[ R]. SPE 90702 ; 2004.
  • 8Calderoni A, Brugman J D, Vogle R E, et al. The contin- uous circulation system - from prototype to commercial tool [R]. SPE 102851, 2006.
  • 9Calderoni A, Chiura A, Valente P, et al. Balanced pres- sure drilling with continuous circulation using joined drillpipe - case history, Port fouad Marine deep 1, explo- ration well offshore Egypt[ R]. SPE102859, 2006.
  • 10石俊江.连续循环系统综述[J].钻采工艺,2008,31(1):60-62. 被引量:14

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部