摘要
介绍了美国尤卡山高放废物处置库项目2009年和2010年费用遭到削减这一事件的来龙去脉,从政治、情感、技术、经济和资源再利用几个方面分析了尤卡山项目经费削减的原因,指出美国参议院多数党领袖里德的激烈反对以及政治考虑是导致费用削减的主要原因。同时介绍了一系列反对削减尤卡山项目经费的观点。
This paper introduces the event that the 2009 and 2010 budgets for the Yucca Mountain Spent Fuel Disposal Project is cut.The reasons for the budget cutting are analyzed in respect of the political, emotional,technical,economical and resource recycle.It is pointed out that the strong objection of Senator Harry Reid and the political consideration are the main reasons for budget cutting.Many objections on the budget cutting are also introduced.
出处
《辐射防护通讯》
2009年第4期28-30,共3页
Radiation Protection Bulletin
关键词
尤卡山
高放废物处置库
费用削减
Yucca moutain project High level radioactive waste repository Budget cutting