期刊文献+

黄河天桥水电站面流消能问题探讨 被引量:1

Study of Issue of Surface Flow Energy Dissipation in Tianqiao Hydro -Power Station in the Yellow River
下载PDF
导出
摘要 天桥水电站采用面流消能,原设计洪水标准为100A一遇。经本次水工整体模型试验,对100A一遇设计洪水、500A一遇校核洪水和1989年实测洪水均作了定床和动床试验研究。成果显示,100A一遇洪水和1989年洪水在建筑物下游可保持面流流态,无严重冲刷;500A一遇校核洪水则出现底流,冲坑较深,应考虑采取工程措施以改善流态,降低单宽流量。 surface flow energy dissipation has been applied in tianqiao hydro -power station with original design of flood Standard of once a hundred years. Floods of once a hundred years, of adjusted once five hundred years and recorded in 1989 are all studied in this hydraulic model experiments of fixed bed and movable bed. The results demonstrate that Floods of once a hundred years and 1989 can keep surface current fluid pattern without severe scour; however, flood Of once five hundred years is with bed current, deep scoured pitches, and therefore, some engineering measures Should be adopted to improve fluid pattern and decrease discharge per unit width.
出处 《人民黄河》 CAS 北大核心 1998年第9期24-26,共3页 Yellow River
关键词 面流 设计洪水 底流 冲刷 消能 径流水电站 surface current, designed flood, bed current, scour, energy dissipation, tianqiao hydro -power station
  • 相关文献

同被引文献4

  • 1潘瑞文,杨叔,徐一民.低坝底面流混合消能的试验研究[J].云南工学院学报,1994,10(2):41-46. 被引量:3
  • 2黄河天桥电站工程指挥部.黄河天桥水电站技术设计书[R].郑州:黄河水利勘测规划设计院,1977..
  • 3黄河水利委员会水科院.黄河天桥水电站运行期整体水工模型试验报告[R].郑州:黄河水利委员会水利科学研究院,1994..
  • 4华北水利水电学院.黄河天桥水电站除险加固工程水工模型试验报告[R].郑州:华北水利水电学院,2004..

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部