期刊文献+

全断面针梁式全圆钢模台车施工工艺及应用效果 被引量:1

Construction Technology and Application Effects of Whole-circle Steel-mould Stair Vehicle of Whole-cross Needle Bridge
下载PDF
导出
摘要 介绍了全断面针梁式全圆钢模台车的结构特点,探讨了该车的安装及移位、衬砌步骤、模板拆除及衬砌后混凝土养护等施工工艺,总结了应用该车衬砌的优点及衬砌效果,可大力推广应用于同类工程的衬砌施工中。 This paper introduced the structural features of whole-circle steel-mould stair vehicles of whole-cross needle bridge, analyzed its construction technology such as installation and shift, lining process, form removing and concrete curing after lining, and the lining advantages and effects of this vehicle were summarized. It can be widely popularized and applied in lining construction of similar engineering.
出处 《水电能源科学》 北大核心 2009年第6期149-151,共3页 Water Resources and Power
关键词 输水洞 衬砌 全断面针梁式全圆钢模台车 结构特点 施工工艺 效果 water transport tunnel lining whole-circle steel-mould stair vehicle of whole-cross needle bridge structural features construction technology effect
  • 相关文献

参考文献2

  • 1潘鼎.建筑施工模板图册[M].北京:中国建筑工业出版社,1993.
  • 2水利水电工程施工手册编委会.水利水电工程施工手册:土石方工程(第二卷)[M].北京:中国电力出版社,2002.

共引文献1

同被引文献21

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部