期刊文献+

百色水利枢纽碾压混凝土坝高温条件施工技术探讨

Probing into construction technique of the rolled concrete dam with high temperature condition in the Baise WR pivotal project
下载PDF
导出
摘要 高温条件下碾压混凝土坝(RCC)施工技术已成为国内外从事RCC工作者最受关注的研究课题之一。根据百色水利枢纽RCC坝环境特性和工程特点,探讨采用RCC理论与施工技术全面应用的综合降温措施,以满足RCC高温条件下施工综合技术的要求。 Now ,the construction technique of rolled concrete dam with high temperature condition is one of the most attended research subjects by the domestic and foreign RCC constructers . According to the environment and project characteristics of the RCC dam in the Baise WR pivotal project , the author probed into that use the comprehensive dropping temperature countermeasures by RCC theory combining with construction technique,to satisfy construction technique needs of the RCCdam with high temperature condition.
作者 韦卓信
出处 《广西水利水电》 1998年第3期19-22,共4页 Guangxi Water Resources & Hydropower Engineering
关键词 综合降温技术 碾压混凝土坝 施工技术 水利枢纽 the RCC dam , high temperature condition, comprehensive dropping temperature countermeasures
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部