期刊文献+

基于协同进化的航天测控资源优化调度 被引量:4

Optimization scheduling of spaceflight TT&C resources based on cooperative co-evolution
下载PDF
导出
摘要 航天测控资源调度是一个具有很强工程背景的复杂问题,针对其特点,研究了一种基于协同进化的优化调度算法。在描述问题并给出调度模型的基础上,基于协同进化的思想,设计了和问题特征结合的遗传算法编码,对算法的算子和进化策略进行了描述,给出了算法的完整流程。通过算例表明,该算法整体上优于先到先服务(first coming first serving,FCFS)算法、任务综合优先度(task synthesis priority,TSP)算法和简单遗传算法(simple genetic algorithm,SGA)。 Tracking telemetry and command (TT&C) resource scheduling of spaceflight is a complex problem with strict engineering background. An optimizing algorithm is studied on the basis of cooperative co-evolution for it. Firstly, the problem is described, and a scheduling model is presented; then the idea of cooperative co-evolution is elaborated, and the genetic algorithm (GA) encoding combining with the problem feature is designed with reference to the idea. Then, the operators, the evolving strategy and the flow of the algorithm are described. By an example, it can be seen that the performance of the proposed algorithm is better than that of first come first service (FCFS), task synthesized priority (TSP) and simple GA (SGA).
作者 陈峰 武小悦
出处 《系统工程与电子技术》 EI CSCD 北大核心 2009年第11期2672-2676,共5页 Systems Engineering and Electronics
关键词 航天测控 调度算法 协同进化 资源调度 spaceflight TT&amp C scheduling algorithm co-evolution resource scheduling
  • 相关文献

参考文献25

  • 1凌晓冬,武小悦,刘琦.多星测控调度问题任务优先级研究[J].数学的实践与认识,2008,38(23):114-120. 被引量:5
  • 2Barbulescu L, Howe A E, Whitley L D, et al. Understanding algorithm performance on an oversubscribed scheduling application[J]. Journal of Artificial Intelligence Research, 2006, 27(1) :577 - 615.
  • 3Sarah E B. Optimal allocation of satellite network resources[D]. USA :Virginia Polytechnic Institute and State University, 1999.
  • 4Cormen T H, Leiserson C E, Rivest R L. Introduction to algorithms[M]. 2nd ed. Massachusett: The MIT Press, 2001:371 - 379.
  • 5Barbulescu L. Scheduling space ground communication for the air force satellite control network[J]. Journal of Scheduling, 2004,7(1) :7 - 34.
  • 6Pemberton J C, Greenwald L G. On the need for dynamic scheduling of imaging satellites[C]//Proc, of Pecora 15/Land Satellite Information Ⅳ/ ISRR Commission Ⅰ /FIEOS, 2002.
  • 7贺仁杰,谭跃进.基于约束满足的卫星地面站资源优化分配问题研究[J].计算机工程与应用,2004,40(18):229-232. 被引量:22
  • 8Clement B J, Johnston M D. Design of a deep space network scheduling application [C] // Proc. of the 5th International Workshop on Planning and Scheduling for Space, 2006.
  • 9Johnston M D. Multi-objective scheduling for NASA's future deep space network array[C]//Proc, of the 5th International Workshop on Planning and Scheduling for Space ,2006.
  • 10金光,武小悦,高卫斌.卫星地面站资源配置仿真研究[J].系统仿真学报,2004,16(11):2401-2403. 被引量:32

二级参考文献73

共引文献131

同被引文献98

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部