通过大红山铁矿的总图设计实践,论述了大红山铁矿400万t/a工程和扩产工程中总图设计所面临的地形狭窄、高差大、地质条件复杂多变、工业场地用地紧张等突出问题,提出了解决这些突出问题的主要对策和总图设计实践。
The prominent problems, such as narrow terrain and large altitude difference, complex and volatile geological conditions, and insufficient industrial land, faced by the general drawing design for 4 million t/a Dahongshan Iron Mine project and its expansion project were discussed by way of the general drawing design's practice for Dahongshan Iron Mine. In addition, main countermeasures which solve the prominent problems and the general drawing design's practice have been put forward.
出处
《有色金属设计》
2009年第3期33-37,共5页
Nonferrous Metals Design
关键词
大红山铁矿
总图设计
突出问题
对策
Dahongshan Iron Mine, general drawing design, prominent problem, countermeasure