摘要
马钢某总厂的备件库为现浇单层排架结构。着重介绍了该备件库在施工现浇排架柱时所采取的技术措施及注意事项。
The spare parts warehouse of Masteel some General Plant is single layer bent-column framework construction of concrete pouring on-site.This paper introduces the technical measures and precautions during pouring into concrete for bent-columns of this spare parts warehouse.
出处
《安徽冶金科技职业学院学报》
2009年第4期34-35,41,共3页
Journal of Anhui Vocational College of Metallurgy and Technology
关键词
排架柱
钢筋
模板
侧压力
bent-column
reinforcement
template
lateral pressure