摘要
详细介绍了戈兰滩水电站从前期查勘到施工阶段的勘测设计全过程,以及在勘测设计中采用的一些新工艺、新技术和新思路,为今后类似工程提供了可借鉴的工程实践经验。
This test introduces the whole process of project investigation and design from proceeding stage to construction of Gelantan hydropower station,and some new technologies,new techniques and new thoughts employed in project investigation and design,which can provide engineering experience for reference of similar projects.
出处
《水利水电工程设计》
2009年第B10期1-3,F0002,F0004,共5页
Design of Water Resources & Hydroelectric Engineering
关键词
戈兰滩水电站
勘测设计
高边坡
矿渣粉
Gelantan Hydropower Station,investigation and design,high slope,slag powder.