摘要
对9层建筑模型进行整体平移的试验研究得出:建筑物平移所需启动牵引力与建筑物自重和滚轴直径的线性关系;并结合大量平移工程的实测牵引力的数据,分析得出滚动式平移牵引力的计算公式。
The monolithic moving test of a nine-story structure model was carried out, and test conclusion was drawn about a linear relationship between the pull force and the structure weight and the roller diameter, and the pull force formula was draw from the measured data and the practical pull force data from lots of moving projects.
出处
《工业建筑》
CSCD
北大核心
2009年第11期90-92,共3页
Industrial Construction