摘要
通过对西单某工程的加固改造,探索一种新的旧柱新梁节点设计与施工方法。该加固工程综合利用结构后锚固技术与预应力拉索技术各自的优势,其设计与施工经验,可为日趋增多的加固改造工程提供新的思路,对类似的加固改造工程有实际的参考价值。
It was explored a new design and construction method of the corbel between the old column and the new beam for a reform project in Beijing. Each ascendancy of the anchoring and pre-stressing technology was applied in this project. The experience of the design and construction can give some advice to the similar project.