2E. M. Goldrat. Critical chain[M] . GreatBarrington, MA: The North River Press, 1997.
3E. M. Goldrat. The goal [M]. Great Barrington,MA. The North River Press,1992.
4Herroelen,W.and Leus R. (2003).Solutionand quality robust project scheduling: Amethodological framework. Research report 0315,Department of Applied Economics, K. U. Leuven.
5M.A. Al-Fawzan, Mohamed Haouari,A bi-objectivemodel for robust resource-constrained projectscheduling[J]. International Journal ofProduction Economics, Vol. 96, (2005), 175-187.
6Koby la ki, P. and Kuchta, D. “A Note onthe Paper by Al-Fawzan, M. A. and Haouari,M. About A Bi-Object ive Problem for RobustResource-Constrained Project Scheduling” [J].International Journal of Product ion Economics,Vol. 107,(2007), 496-501.
7StijnVan de Vonder.Erik Demeulemeester. WillyHerroelen.Roel Leus.The use of buffers inproject management: The trade-off betweenstability and makespan[J]. Int. J. Product ionEconomics, 2005,(97): 227 - 240.
8D. S. Yamashita, V. A. Armentano, M. Laguna, Robustoptimization models for project schedulingwith resource availability cost [J] . Journal ofScheduling, 2007, (10), 67 - 76.
9Hazir, 0. , Haouari, M. , Ere 1, E., “Robustscheduling and robustness measures for thediscrete time/cost tade-off problem” [J].European Journal of Operational Research, Vol.201,No. 2, 2010,633-643.
10M.Konig, Robust Construction Scheduling UsingDiscrete-Event Simulat ion [C]. Proceedings of the2011 ASCE International Workshop on Computing inCivil Engineering.