摘要
介绍了马钢新区电厂135MW汽轮发电机组工艺系统有关设备和管道等的设计选型和布置等问题,并比较了与小型机组在设计上的不同之处。
Design, selection and arrangement of the related equipment and pipes for the process system of 135 MW turbo-unit of the power plant in the newly-built area of Maanshan Iron & Steel Co., Ltd were presented. The differences between the design of the turbo-unit and the design of small units were compared.
出处
《冶金动力》
2009年第6期3-5,共3页
Metallurgical Power