摘要
分析峡口大坝施工期混凝土裂缝产生的原因,介绍其处理方法和处理效果。今后应注意施工中加强温控防裂措施和施工管理。招标合同中应设立裂缝"风险合理分担"责任条款。
The factors which cause the cracks of Xiakou concrete arch dam are analyzed,the crack treatment measures and effect are described.It is to be noted that the temperature control work must be strengthened in construction of concrete dam hereafter,and the clause about share responsibility of crack risk should be concluded in the contract files.
出处
《湖北水力发电》
2009年第5期52-56,共5页
Hubei Water Power
关键词
峡口工程
拱坝
混凝土裂缝
温度控制
Xiakou Hydropower Project
arch dam
concrete crack
temperature control