为了缓解湖南乃至华中电网调峰紧情局面及优化系统电源结构的需要,对柘溪水电站进行了扩建。关于扩建工程的接地网设计详情予以介绍。
For the purpose of relieving the tense situation of peak regulation and optimizing the energy source structure of Hunan power grid and even Huazhong power grid,the Zhexi Hydropower Station is extended.The details about the earthed network of the extension project are described.