煤巷综掘连续两年破万米

Advance Rate of Over 10000m Per Year for 2 Years in Succession by Header
下载PDF
导出
摘要 总结以AM-50型掘进机等综掘机械化作业线的破、落、装、运、支、过断层等工艺和施工管理的经验和问题。 Complete mechanized heading operational line(OMHOL) consists of AM-50 header, stage loader, belt conveyor, flight conveyor, dust-fan, auxiliary fan and mobile transformer. Advance rates of CMHOL achieved 12189 m in 1987 and 11552 m in 1988. Experience of high advance rate is considering relationship between full machanized driving rapid advance and moving from one face to another frequetly; cutting coal from top to bottom, left to right, then from right to left; moving coal out by header, stager loader and conveyors; roadways supporting by trapezoid I steel support, spacing 0.8 m away, coal conveying by upper belt of belt conveyor, support, bottom; ventilating by auxiliary fan, wet dusting by dust-fan, also spraying and watering for dusting; adopting some measures for header moving, passing faults and turning; impvoving crew organizetion.
作者 张恩义
出处 《煤炭科学技术》 CAS 北大核心 1990年第1期14-17,共4页 Coal Science and Technology
关键词 煤巷 施工 综掘
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部