戛洒江一级水电站坝基冲积层利用研究

Research on Utilization of Alluvium on Dam Foundation for Gesa River I Hydropower Station
原文传递
导出
摘要 是红河(元江)干流梯级综合规划十二级开发方案的“龙头“水库,该工程是以发电为主,兼顾防洪、灌溉等综合利用的水利水电枢纽工程。冲击层以上坝高146.5m,冲积层最大深度20m~35m,本文简要介绍了戛洒江一级水电站将面板坝坝基冲积层利用研究,对相似工程有一定的借浆作用. It is the leading reservoir for comprehensive cascade XII development plan for main river cascade for Honghe (Yuanjiang), and the project is mainly for power generation, and is with water resources & hydropower complex project for flood prevention and irrigation. The highest dam above the alluvium is 146.5m high, and maximum depth of alluvium is 20m-35m. The paper introduces the research on utilization of alluvium on dam foundation of face rockfill dam for Gesa River I Hydropower Station, and provides certain reference for similar projects.
出处 《云南水电技术》 2009年第2期13-18,共6页
关键词 高面板坝 趾板 河床冲击层 戛洒江一级水电站 High face rockfill dam toe board riverbed alluvium Gesa River I Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部