摘要
是红河(元江)干流梯级综合规划十二级开发方案的“龙头“水库,该工程是以发电为主,兼顾防洪、灌溉等综合利用的水利水电枢纽工程。冲击层以上坝高146.5m,冲积层最大深度20m~35m,本文简要介绍了戛洒江一级水电站将面板坝坝基冲积层利用研究,对相似工程有一定的借浆作用.
It is the leading reservoir for comprehensive cascade XII development plan for main river cascade for Honghe (Yuanjiang), and the project is mainly for power generation, and is with water resources & hydropower complex project for flood prevention and irrigation. The highest dam above the alluvium is 146.5m high, and maximum depth of alluvium is 20m-35m. The paper introduces the research on utilization of alluvium on dam foundation of face rockfill dam for Gesa River I Hydropower Station, and provides certain reference for similar projects.
关键词
高面板坝
趾板
河床冲击层
戛洒江一级水电站
High face rockfill dam
toe board
riverbed alluvium
Gesa River I Hydropower Station