金安桥水电站宽戗堤立堵截流设计与实践

Design and Practice for Closure of Berm-Dam ofAnjinqiao Hydropower Station
原文传递
导出
摘要 金安桥水电站是金沙江中游河段第一座截流的电站,截流设计标准及流量为P=10%,12月中旬,流量889m3/s。经水力学计算及模型试验验证,若采用单戗堤截流,截流具有截流落差大、龙口流速大、单宽功率高等特点。鉴于单戗堤截流难度较大,双戗堤截流在本工程不具优势,设计提出采用宽戗堤(顶宽50m)立堵截流方案,经实践证明是合理可行的,截流过程顺利。 Anjinqiao Hydropower Station is the first river closure hydropower station on the middle reaches of Jiasha River, the river closure design standard and flow is P=10%. In the middle December, the flow is 889m3/s. According to the hydraulic calculation and model experimental verification, if the single berm-dam closure, the river closure has the characteristics of large fall, high port flow rate, high single wide power. Whereas the single berm-dam closure is difficult, double berm-dam closure does not have advantage in the project. Accordingly, the design proposes to adopt the wide berm-dam closure (design height 50m), which is reasonable and feasible through practice, and the closure process is smooth.
出处 《云南水电技术》 2009年第2期21-25,共5页
关键词 金安桥水电站 立堵截流 宽戗堤 Anjinqiao Hydropower Station Closure Wide berm-dam
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部