摘要
佛山市世纪莲体育中心体育场设40根大斜柱承担上部结构荷载,每个大承台受力复杂,既有水平预应力筋,又有竖向斜柱预应力筋及预应力锚杆等。为此制订了合理的施工顺序并有针对性地采取一系列技术措施,解决了施工难点。
Stadium of Foshan Century Lotus Sports Center adopts 40 pieces of large oblique posts to bear the superstructure load. Forces on each large bearing platform are complicated, including horizontal prestressed reinforcement and longitudinal oblique prestressed reinforcement and prestressed anchor shaft. Reasonable construction sequence and a series of specific technical measures are established to solve the construction difficulties,
出处
《建筑技术》
北大核心
2009年第12期1082-1085,共4页
Architecture Technology