摘要
营口开发区中心医院门诊病房楼工程中,对桩基础方案进行优化,在滨海地区复杂地质条件下应用预应力混凝土管桩,并采取技术措施解决了混凝土结构超长设计问题,提出复杂平面应以建筑物折算宽度计算高宽比的方法。
In the structural design of ward building of Central Hospital in Yingkou Development Zone, pile foundation plan is optimized. Prestressed tubular piles are used under the complex geological conditions in offshore region, technical measures are adopted to solve the problem in super-long concrete structure design. It is proposed that height-to-width ratio of complicated plane shall be calculated according to reduced width of building.
出处
《建筑技术》
北大核心
2009年第12期1093-1095,共3页
Architecture Technology
基金
辽宁省自然科学基金资助项目(2005008)
关键词
桩基础
超长混凝土结构
建筑物折算宽度
pile foundation
super-long concrete structure
reduced width of building