长沙东方.新世界工程采用钢筋混凝土桁架式转换层,桁架总高4.8m、跨度12m,施工难度大。分析钢筋混凝土桁架式转换层施工重点及难点,介绍钢筋混凝土桁架式转换层钢筋、混凝土工程,模板及支撑系统施工技术。
East-New World engineering project in Changsha employed truss stiffened transition layer of reinforced concrete. The truss of this project is 4.8-meter high and 12 meter span, and difficulties of the construction are considerable. This dissertation firstly analyzed the key points and difficulties of construction which used truss stiffened transition layer of reinforced concrete, and then introduced reinforcement engineering by truss stiffened transition layer of reinforced concrete and concrete engineering, templates and construction technology of support system were explained in the end.
出处
《建筑技术》
北大核心
2009年第12期1133-1135,共3页
Architecture Technology
关键词
钢筋混凝土
桁架式转换层
施工技术
reinforced. concrete
truss stiffened transition layer
construction technology