摘要
针对大焦炉工程施工测量精度要求高的特点,对大焦炉施工测量技术要点进行了研究,并结合实例进行说明,取得了良好效果,供同类大焦炉工程施工时参考.
In view of the high accuracy required for the measurements in constructing a large-sized coke oven,this article aims to approach some problems associated with the measurements involved in constructing the oven. Being full of practical cases, and the articIe can be used for reference to similar coke oven projects.
出处
《南方金属》
CAS
2009年第6期56-58,共3页
Southern Metals
关键词
大焦炉
炉本体施工
测量技术
large-sized coke oven
oven construction
measurement techniques