期刊文献+

刚性井筒装备的设计及作用力计算 被引量:13

Design and Applied Force Calculatio of Rigid Mine Shaft Equipment
下载PDF
导出
摘要 评述刚性井筒装备的罐梁和罐道截面形式、水平层格结构形式和层间距;分析井筒装备负荷、水平力的计算方法。 To equip a mine shaft, a bunton with a cross section of an annular form or stream line form is better than the H form steel. The guide with a square hollow section is better than timber guide and steel rail. A layer frame with no bunton is the best for the horizontal layer frame structure of the bunton. An ration clearance between the layers of the bunton is about 4 m to 6 m. The clearance in design and instalation is 6 m. A construction mehtod of resin bolt and cement bolt for the pleacement of bunton is faster than the steel plate in shaft liner welding with bunton. The for(?)es loading on mine shaft equipment are mainly horizontal forces, dividing into a forward horizontal force Py and a side horizontal force Px. Defferent in an viberation of a hoisting container, rigid of equipment, terminol loading Q and hoisting speed will cause defferent horizontal forces. The simplified formulation for the horizontal force is Py=KQV, Px=0.8Py, Pv=0.25 Py,K=coefficient. To meet the project calculation of horizontal forces, it can found a law to determinate quantity relationship of multi parameters base on combinations of site survey, theratical study and lab test.
机构地区 中国矿业大学
出处 《煤炭科学技术》 CAS 北大核心 1990年第8期5-8,共4页 Coal Science and Technology
  • 相关文献

同被引文献37

  • 1刘志强,郭晋蒲.刚性井筒装备质量检测的新途径[J].煤炭科学技术,1995,23(2):6-9. 被引量:5
  • 2王健.钢罐道及罐道梁三维结构电算分析[J].煤矿设计,1995(2):18-22. 被引量:1
  • 3哈尔滨建筑工程学院.玻璃纲结构分析与设计[M].北京:中国建筑工业出版社,1981..
  • 4曾宪桃.立井复合材料罐道性能及其合理截面参数的研究[M].徐州:中国矿业大学,1993..
  • 5徐芝伦.弹性力学(上册,第3版)[M].北京:高等教育出版社,1998..
  • 6哈尔滨建筑工程学院.玻璃钢结构分析与设计[M].北京:中国建筑工业出版社,1981..
  • 7徐芝伦.弹性力学(上册)(第3版)[M].北京:高等教育出版社,1998..
  • 8夏荣海,等.矿井提升机械设备[M].徐州:中国矿业大学出版社,1981.
  • 9史天生,立井井筒装备,1981年
  • 10徐芝纶,弹性力学.上(第3版),1998年

引证文献13

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部