期刊文献+

复吹转炉冶炼低磷钢工艺 被引量:4

Process of smelting low phosphorus steel in combined blowing converter
原文传递
导出
摘要 探讨了复吹转炉采用常规冶炼工艺和脱磷预处理直炼工艺冶炼低磷钢的工艺条件。A、B两厂采用常规冶炼工艺,当炉渣w(T.Fe)=16 %~24 %,炉渣碱度为3.5时,要稳定冶炼w(P)<0.01 %的低磷钢时,终点w(C)应控制在0.05 %以下。C、D厂采用脱磷预处理直炼工艺,当一倒w(C)〈0.10 %时,钢水w(P)能控制在0.01 %以下。预处理直炼工艺脱磷、脱碳期的关键是控制总渣量和半钢磷含量,为使冶炼w(P)〈0.01 %低磷钢的同时吨钢总渣量控制在90 kg以内,当脱磷期倒渣率达到40 %~50 %时,半钢w(P)最高应控制在0.026 %~0.037 %。 The present paper discusses the process conditions of smelting low phosphorus steel by conventional process and hot metal dephosphorizing pretreatment and direct steel-making process in combined blowing converter. Steel Plants A and B adopted the conventional process. For those two Plants when the(%T. Fe)is 16-24% and the slag basicity is 3.5 the low phosphorus steel with w(P) less than 0. 01% can be consistently produced only if the end-point w(P) in steel is controlled in less than 0.01%. Neverthe- less Plants C and D introduced the hot metal dephosphorizing pretreatment and direct steel-making process. For them the w(P) in steel can be controlled in less than 0. 01% as soon as the condition of w(C)〈0. 10 % is achieved. For the latter one of those two processes the key points in the dephosphorizing and decarburizing phases are controlling the total slag volume and [P] after dephosphorizing pretreatment. In order to control the total slag volume/ton steel within 90 kg in smelting the low phosphorus steel with [P] less than 0. 01% the highest level of [P] after dephosphorizing pretreatment should be controlled in 0. 026-0. 037 %0 when the deslagging rate in the period of dephosphorization arrives at 40 %-50%.
作者 李峻 刘浏
出处 《炼钢》 CAS 北大核心 2009年第6期15-19,共5页 Steelmaking
关键词 复吹转炉 脱磷预处理 造渣 磷分配比 combined blowing converter dephosphorizing pretreatment slagging phosphorus distribution ratio
  • 相关文献

参考文献2

二级参考文献4

共引文献32

同被引文献38

  • 1孙礼明.转炉双联法冶炼工艺及其特点[J].上海金属,2005,27(2):44-46. 被引量:41
  • 2赵岩 陈登福 张竹明 等.高磷铁水脱磷的实验室研究.中国稀土学报,2008,:682-684.
  • 3The Technical Society,The Iron and Steel Institute of Japan.Pro-duction and Technology of Iron and Steel in Japan during 2010. Iron and Steel Institute of Japan . 2011
  • 4Kitamura S Y.Introduction of steel refining process engineering. Tetsu-to-Hagané . 2010
  • 5L Zhang,and Brian G Thomas.State of the art in evaluationand control of steel cleanliness. ISIJ International . 2003
  • 6曲英.炼钢学原理[M]冶金工业出版社,1994.
  • 7Fix W, Heymann H, Heinke R. Subsolidus relations in the system 2CaO'SiO2 -3CaO'P2Os [J ]. Journal of the American Ceramic Society, 1969, 52 : 346 -347.
  • 8Fukagai S, Hamano T, Tsukihashi F. Formation reaction of phosphate compound in multi phase flux at 1573K [J]. ISIJ International, 2007, 47 ( 1 ) : 187 - 189.
  • 9Yang x, Nakase K, Matsuura H, et at. Formation of phosphate compound in multi -phase flux [J ]. CAMP -ISIJ, 2008, 21 : 994.
  • 10Yang X, Matsuura H, Tsukihashi F. Condensation ofP205 at the interface between 2CaO SiO2 and CaO -SiO2 -FeOx - P2Os slag [J]. ISIJ International, 2009, 49 (9): 1298 --1307.

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部