摘要
以承德县为例,根据层次分析法的原理并结合水厂布局方案,建立了定量评价指标体系和层次结构模型,并进行了层次排序及一致性检验,给出了3个方案的优选排序,从而得到最优水厂布局方案。
As an example in Chengde County, and according to the principle of analytic hierarchy process combined with three schemes, a quantitative assessing criteria and hierarchical structure model were established. Hierarchy ranking and consistency checking were also done to bring out optimization and sequencing of the three schemes, and consequently the best one could be chosen.
出处
《供水技术》
2009年第6期21-24,共4页
Water Technology
关键词
水厂布局
方案优选
AHP
layout of waterworks
scheme optimization
analytic hierarchy process