摘要 通过对顶山隧洞进出口水工模型试验研究,验证隧洞进出口各种工况下的水流流态和消力池的消能效果及水流对下游渠道可能产生的冲刷影响;试验测得隧洞进出口水流流态基本平稳,隧洞出口的消力池末端流速不大,不会对下游渠道产生大的冲刷破坏。 Through the hydraulic model test about import and export of Hill Top Tunnel to verify the flow conditions of the stilling basin of import and export in all kinds of tunnel and the effect of energy dissipation and the possible impact of the erosion of flow channels on the lower reaches;tunnel test measured the basic steady flow in the import and export,tunnel stilling basin export terminal velocity is not and will not have a great impact on the downstream channel erosion damage.
出处 《水利科技与经济》 2009年第11期973-974,976,共3页 Water Conservancy Science and Technology and Economy
基金 新疆维吾尔自治区水利水电工程重点学科资助项目(XJZDXK-2002-10-05)
关键词 水流流态 消能 冲刷 顶山隧洞 flow conditions energy dissipation erosion Hill Top Tunnel
  • 相关文献

参考文献4

  • 1SL155-95,水工(常规)模型试验规程[S].
  • 2吴持恭.水力学[M].北京:高等教育出版社,1983:280-283.
  • 3南京水利科学研究院.水工模型试验[M].北京:水利电力出版社,1985..
  • 4梁文龙,李贵平,余跃.隧洞进水口及洞内消能水工模型试验研究[J].贵州工业大学学报(自然科学版),2001,30(3):95-100. 被引量:6

二级参考文献2

  • 1祁庆和.水工建筑物(第二版)[M].北京:水利电力出版社,1986..
  • 2成都科学技术大学水力学教研室.水力学[M].北京:人民教育出版社,1979..

共引文献58

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部