摘要 开发水电资源,可以替代火电,减少二氧化硫的排放量,为节能减排做出积极地贡献.根据汤旺河干流水电规划,尝试对规划实施后替代的二氧化硫减排量进行分析和计算. There are rich hydropower resources which are clear energy in the catchments; therefore hydropower plan- ning of the mainstream is under preparation. The development of hydropower energy can substitute heat power stations and reduce SO2 emission. It can make a contribution to saving energy and reducing emission carrying out in China now. According to hydropower planning on the mainstream, reduced SO2 emission resulting from hydropower station construction is analyzed and calculated.
出处 《哈尔滨师范大学自然科学学报》 CAS 2009年第5期99-101,共3页 Natural Science Journal of Harbin Normal University
关键词 干流 水电站 规划 二氧化硫 排放量 节能减排 Mainstream Hydropower station Planning SO2 Emission Saving energy and reducing e mission
  • 相关文献

参考文献3

  • 1黑龙江省水利水勘测设计研究院.黑龙江省汤旺河干流梯级水电站规划报告[R].哈尔滨:黑龙江省水利水勘测设计研究院.
  • 2张平 杨志平 杨勇平.抽水蓄能电站与大型火电机组经济性能比较.华东电力,2009,(2).
  • 3曲德双,刘艳艳,韩守江.汤旺河流域水电站设计中景观保护和重建的思路[J].黑龙江水利科技,2008,36(4):79-80. 被引量:1

二级参考文献2

  • 1黑龙江省水利水电勘测设计研究院.黑龙江省汤旺河干流梯级水电站规划报告[R].哈尔滨:黑龙江省水利水电勘测设计研究院,2008.
  • 2李建新.景观生态学实践和评述[M].北京:中国环境科学出版社,2007.