期刊文献+

贵州某塑胶标准田径场的施工技术 被引量:1

Construction technology for standard plastic track-and-field ground in Guizhou region
下载PDF
导出
摘要 贵州已建造了数个塑胶标准田径场。由于该地区山地多、地势起伏大,再加上国家缺乏相应的施工规范,施工难度较大,施工质量不易控制。在该地区建造塑胶标准田径场,应主要控制好地基、底基层、基层、底面层、面层的施工。 Several standard plastic track-and-field grounds have been built in Guizhou. However, due to numerous mountains and high relief amplitude in this region and for lack of corresponding national construction code,it is hard to implement construction and control construction quality. To build standard plastic track-and-field ground in this region, the construction for ground foundation, subbase, base course and surface course shall be well controlled.
作者 龙鳘
机构地区 毕节学院
出处 《四川建筑科学研究》 北大核心 2009年第6期315-318,共4页 Sichuan Building Science
关键词 贵州 塑胶标准田径场 施工技术 Guizhou standard plastic track-and-field ground construction technology
  • 相关文献

参考文献4

  • 1JTGF40-2004公路沥青路面施工技术规范[S].北京:人民交通出版社,2004:23-39.
  • 2JTJ034-2000公路路面基层施工技术规范[S].北京:人民交通出版社,2000.
  • 3GB/T14833-1993塑胶跑道[S].北京:中国标准出版社,1994.
  • 4倪修全.塑胶标准田径场工程施工工艺[J].建筑技术,2005,36(7):499-500. 被引量:7

二级参考文献1

  • 1陈然.道路建筑材料[M].北京:人民交通出版社,1995,8..

共引文献270

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部