摘要
文章结合当涂县江心洲左缘崩岸应急处理工程施工,探讨水下平顺抛石护岸施工工艺及质量控制。
This paper discusses the constraction techniques and quality control of the underwater smooth ripped-rock revetment by presenting the constraction practice of the emergency treatment engineering of the left bank sloughing in Jiangxin Chau,Dangtu County.
出处
《安徽水利水电职业技术学院学报》
2009年第4期38-39,共2页
Journal of Anhui Technical College of Water Resources and Hydroelectric Power
关键词
定位
石料
抛石量
positioning
stone
jackstone amount