大跨度钢管混凝土拱桥吊装过程的索力逆分析 被引量:27

Inverse Analysis of Cable Forces on Filled SteelFubular Arch Bridge with Long Spanin Process of Installation
下载PDF
导出
摘要 针对大跨度钢管砼拱桥在钢管吊装和分段砼泵送的施工过程中,需要通过扣索来保持拱形和分担砼的重量.保证施工质量和安全,控制索力是一种重要手段.通过计算力学的逆分析方法,给出扣索的索力,经算例验证是合理的,其计算程序可作为此类桥型的优化施工软件. オn process of installation of steel tube and segmental pumpdelivery of concrete for construction of concretefilled steel tubular arch bridge with a long span,bucklecables are required to hold arch shape and to share weight of concrete.In order to ensure quality and safety of construction,an important means to control the bucklecable forces is used.This paper deduces a solution of the bucklecable forces from inverse analysis method of computational mechanics.The method proves to be reasonable through a counting example.The designed computer program has prospect in application for optimal construction of this kind of bridge. 
出处 《武汉交通科技大学学报》 1998年第3期223-226,共4页 Journal of Wuhan University of Technology(Transportation Science & Engineering)
基金 国家自然科学基金
关键词 拱桥 索力 逆分析 钢管混凝土拱桥 吊装 arch bridge cable forces inverse analysis
  • 相关文献

参考文献3

  • 1徐风云.SRC拱桥及CFST拱桥的设计优化研究.见:戴竞主编.1996年桥梁学术讨论会论文集.北京:人民交通出版社.1996.182-193.
  • 2郑皆连,徐风云,唐柏石等,广西邕宁邕江大桥千斤顶斜拉扣挂悬拼架设钢骨拱绗架施工计算方法.见:戴竞主编,1996年桥梁学术讨论会论文集.北京:人民变通出版社.1996.214-228.
  • 3久保司郎.逆问题.东京:培风馆,1992.15-56.

同被引文献71

引证文献27

二级引证文献163

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部