介绍中国援孟加拉国的卡洛多瓦(Karatoya)河公路桥建造中,筑岛深砂层钻孔灌注桩及采用拆装式轻便架桥机吊装空心板梁的施工情况。
The construction behaviour about bored piles and hollow plate girder hanged by demountably protable girder erecting machine was introduced during the construction of Bangladesh Karatoya River Highway Bridge undertaken by China.