摘要
随着铁路施工技术的不断发展,铁路改建工程的投资规模日益扩大,为了提高工程成本的经济管理水平,必须加强施工索赔工作。此文以沙鲅支线扩能改造信号工程为例,探讨铁路改建工程索赔的重要性以及索赔的具体方法,强调索赔工作应注意时效性,要准确计算索赔金额。成功实施索赔,是实现对铁路改建工程的高效率管理,实现国家和企业的宏观、微观效益双赢的重要途径之一。
With the high - speed development of railway construction and the growing scale of investment projects, it is essential to enhancing management level of reducing engineering cost and to emphasizing on claiming for compensation during construction. This article uses the concrete example of capacity expansion reform on signaling engineering in the Shaba Line to fully reveal the specific process and the importance of the claiming for compensation, and highlight the timeliness and accurate claim ammout in the claim works. The successful implementation on the claiming for compensation can help us gain some management with great efficiency in the railway construction, which will create a harmonious environment for nation and enterprise, thus can we achieve double wins in microscopic and macroscopic aspects.
出处
《铁路工程造价管理》
2009年第6期45-47,共3页
Railway Engineering Cost Management
关键词
铁路
改建工程
施工
索赔
railway
reconstruction project
construction
claim