期刊文献+

绍兴市老排污泵站综合改造实例探讨

The study to the comprehensive transformation of the old sewage pumping station in Shaoxing city
下载PDF
导出
摘要 鉴于绍兴市部分老泵站建设年代久远,机电设备陈旧老化,存在运行安全隐患,同时,建筑与周边环境不协调等问题,绍兴市计划对该批老泵站进行综合改造,根据该工作思路,在2009年对城区3号泵站进行了综合改造,并就综合改造实施情况及取得的成效进行了说明总结。 Shaoxing city have parts of the long history pumping station building,ageing electrical mechanical equipment,there are security risks to run,and also the building uncoordinated with the surrounding environment.Shaoxing city plans to undertake a comprehensive transformation of the old pumping station.According to the plan,in 2009 we take a comprehensive reform to No.3 pumping station on the city.In this paper,introduced Shaoxing city No.3 pump station s comprehensive plan implementation and results achieved.
出处 《山西建筑》 2009年第36期188-189,共2页 Shanxi Architecture
关键词 泵站 综合改造 改造效益 pumping station comprehensive reform transformation efficiency
  • 相关文献

参考文献2

  • 1GB 50014-2006,室外排水设计规范[S].
  • 2SD204-1986,泵站技术规范[S].

共引文献197

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部