摘要
汶川地震断裂带科学钻探项目一号孔(WFSD-1)钻遇了30多米的断层泥。针对断层泥钻探的主要问题,对断层泥钻探泥浆体系进行了研究与应用,形成了具有高密度、低失水、低渗透、润滑减阻特点的泥浆体系,再加上重泥浆体系对地应力的平衡作用,成功地解决了断层泥的钻进取心问题,为顺利完成钻孔施工任务奠定了坚实的基础。
The first drilling hole of the Wenchuan earthquake fault science drilling project (WFSD - 1 ) experienced up to more than 30 meters of the fault gouge drilling process. According to the research and application, the drilling mud system with high density, low water loss, low permeability, lubrication and resistance reducing was formed, and together with the equilibration by ground stress, coring in fault gouge was successfully made, which was the basis of the successful completion of the first hole construction in the Wenchuan earthquake fault scientific drilling.
出处
《探矿工程(岩土钻掘工程)》
2009年第12期13-15,19,共4页
Exploration Engineering:Rock & Soil Drilling and Tunneling
基金
科技部科技支撑计划专项"汶川地震断裂带科学钻探(WFSD)"项目之"科学钻探与科学测井"课题
关键词
科学钻探
汶川地震断裂带
断层泥
泥浆体系
scientific drilling
Wenchuan earthquake fault
fault gouge
drilling fluid system