摘要
根据某工程的实际情况,提出四叠瀑和滑瀑两种瀑布方案,通过两种方案的瀑布构造、堰上水头、设计单宽流量和循环水泵选型的比较,得出了滑瀑方案更合适、能耗更小的结论。
According to practical situation of one project,it provides two waterfall schemes of the quadric-pile waterfall and the slip waterfall,accords to the comparison on the two schemes' waterfall structure,water head on the weir,design of the unit width discharge and selection of the circulating water pump,gets conclusion that the slip waterfall scheme is more suitable and has smaller energy consumption.
出处
《山西建筑》
2010年第2期193-194,共2页
Shanxi Architecture
关键词
人工瀑布
堰上水头
设计单宽流量
artifical waterfall
water head on the weir
design of the unit width discharge