摘要
介绍了超前大管棚在深南路—红岭路人行地道工程A通道施工过程中施工工艺的流程操作、施工要点的控制和大管棚施工中对地质情况的探测等,同时积累超前大管棚施工经验,进而推广大管棚施工技术的应用。
Combined with the construction work of advanced large pipe shed of the A passageway of Shennan road-Hongling road pedestrian subway the operation flow of construction technology,key points for construction control and geological exploration in construction are introduced in order to accumulate experiences for the construction of advanced large pipe shed and promote the application of this technology.
出处
《山西建筑》
2010年第2期337-338,共2页
Shanxi Architecture
关键词
超前管棚
施工方法
地质探测
advanced pipe shed
construction method
geological exploration