摘要
以南京某基坑工程为例,阐述了基坑工程信息化施工过程中的设计调整情况,从而提高深基坑工程的设计和施工水平,同时积累相关经验,确保工程按时完成。
Taking one foundation pit project in Nanjing as example,it describes design adjustment situation in the foundation pit project information construction,thus improving design and construction level of the high deep foundation pit project,and accumulating corresponding experiences,ensuring project completing on time.
出处
《山西建筑》
2010年第1期132-133,共2页
Shanxi Architecture
关键词
深基坑
土方开挖
施工监测
方案调整
deep foundation pit
earthwork excavation
construction supervision
scheme adjustment