通过某高层住宅剪力墙滑模施工的应用,从混凝土的质量控制、模板的滑升、出模强度控制、纠偏等几方面进行了探讨和研究,提出如果技术可靠、措施得当、管理到位,滑模工艺的快速高效可以得到充分的体现。
Through application of shear wall structure slide-form construction in a high rise residence,it was discussed and researched from concrete quality control,form climbing,mould unloading strength control and deviation rectification.It pointed out that if the technology was reliable,the measures were expedient,the management was in place,the fast and high efficiency of slide-form technology can be embodied fully.