摘要
针对广梧高速公路新屋高架桥3号墩桩基岩溶发育、施工难度大的现状,着重介绍了3号墩桩基溶洞处理技术,并对处理后的效果进行了评述,为该地质病害的处理积累了经验。
Aiming at the current situation that the high difficulties of the pile karst cave development construction of the third pier on the Xinwu viaduct of Guang-Wu expressway,it emphatically introduces the pile foundation karst cave treatment technology of the third pier,and gets evaluation on effect after treatment,accumulates experiences for treatment of this geological disease.
出处
《山西建筑》
2010年第1期349-350,共2页
Shanxi Architecture
关键词
桥梁
桩基
溶洞
处理
bridge
pile foundation
karst cave
treatment