摘要
以济宁市太白楼西路梁济运河大桥16号墩承台大体积混凝土施工为例,介绍了大体积混凝土施工中控制温度裂缝产生和发展的措施,为类似大体积混凝土施工提供了经验。
Taking the mass concrete pile-cap construction of No.16 pier of Liangji Canal Bridge on West Taibailou Road in Jining City as an example,this paper introduces some measures for controlling the generation and development of the temperature crack in mass concrete construction,which provide the experiences for similar mass concrete construction.
出处
《科技情报开发与经济》
2009年第32期137-139,共3页
Sci-Tech Information Development & Economy
关键词
大体积混凝土施工
温度裂缝
温度控制
mass concrete construction
temperature crack
temperature control