摘要
从坝顶高程、坝体断面、分区、填料、坝基处理、面板、趾板、止水等方面阐述了柏叶口水库大坝的设计方案,此项目可解决吕梁市平川四县市严重缺水问题,推动吕梁市的经济发展。
This paper presents the dam design of Baiyekou Reservoir in details,covering the crest elevation,the dam section,zoning,fillers,dam foundation,panels,toe plate,sealing and other aspects,which is helpful to solve the problem of severe water shortage in four counties of Pingchuan,Lvliang,and promotes their economic development.
出处
《科技情报开发与经济》
2009年第33期224-226,共3页
Sci-Tech Information Development & Economy