期刊文献+

Dy11接线方式的配电变压器并联时高压侧相序错接的排除及其探讨 被引量:2

Fault analysis of Dy11 connection mode of distribution transformers parallel
下载PDF
导出
摘要 广东省粤北某110kV变电站的一新投运站用变压器与该站原配电变压器低压侧并联时,发现相序接错的情况,针对此类问题经常出现在变电站的生产实际与改造过程中,详细分析了在Dy11接线方式下配电变压器低压侧并联时,高压侧相序错接的6种可能性与解决的方案[1~3]。并以该站的具体事例证实了分析结果的正确性,为工程实际现场新增变压器高压侧错误接线提供了迅速正确的改接方案,具有实际的现场工作意义。 It is found wrong when Guangdong Province northern 110kV transformer substation's new distribution transformer puts the parallel operation with the original distribution transformer. Against such problems frequently appear in the actual substation and the transformation of the production process, the paper detailedly analyzes of the manner in Dyl 1 wiring side parallel low-voltage distribution transformers, high-voltage sequence wrong side of the next six kinds possibilities with the solution. With actual examples of the analysis results, it also confirms the correctness of the actual project site for the new high-voltage transformer wrong side of the wiring to provide rapid access to the right programmes. It has the practical significance of the scene.
作者 李勇 胡佐
出处 《电力系统保护与控制》 EI CSCD 北大核心 2009年第24期232-236,共5页 Power System Protection and Control
关键词 配电变压器 Dy11接线方式 相序 并联 distribution transformer Dyl 1 connection phase sequence parallel
  • 相关文献

参考文献3

  • 1变压器制造丛书编委会.变压器试验[M].北京:机械工业出版社,2003..
  • 2谢应璞.电机学[M].成都:四川大学出版社,1994..
  • 3邱毓昌.高电压工程CMJ[M].西安:西安交通大学出版社,1994.

共引文献6

同被引文献3

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部