期刊文献+

改建铁路青藏线西宁至格尔木段增建第二线工程地质灾害危险性评估 被引量:2

ASSESSMENT OF THREATENING ENGINEERING GEOHAZARDS ON THE SECTION BETWEEN XINING AND GOLMUD AS PART OF THE SECOND PHASE OF THE QINGHAI-TIBET RAILWAY PROJECT.
下载PDF
导出
摘要 青藏铁路西宁至格尔木段增建第二线工程作为青藏铁路的一部分,线路全长约763.2 km,沿线地质构造复杂和地层岩性岩相变化大,线路穿越多个构造单元,地质灾害发育;本文对沿线区域内地质环境条件进行了详细论述,对地质灾害的类型、分布进行了阐述,对工程建设可能引发或加剧和工程建设本身可能遭受地质灾害的危险性进行了预测评估和综合评估,提出了防治地质灾害的措施及建议。 Construction of the railway from Xining to Golmud is an additional second-line engineering as a part of the Qinghai-Tibet railway, with a whole length 763.2km. There are complex geological structures and lithology facies variation passing through several tectonic units, easily causing geological hazards; In this paper, the regional geo-environment conditions and possible types of geological disasters were discussed in detail , and distribution are set forth, for the construction and engineering may trigger or exacerbate the building itself may be subjected to risk of geological disasters in the forecasting evaluation and integrated assessment, proposed measures for prevention and control of geological disasters and recommendations.
作者 部瑞梅
出处 《陕西地质》 2009年第2期89-96,共8页 Geology of Shaanxi
关键词 地质灾害 危险性评估 建设场地适宜性 geohazard assessment of threatening suitability of construction field
  • 相关文献

参考文献5

  • 1罗元华,张梁,张业成.地质灾害风险评估方法[M].北京:地质出版社,1988.
  • 2铁路工程地质实例西北及相邻地区分册[M].北京:中国铁道出版社,2002.
  • 3中国灾害防御协会铁道分会中国铁道学会水工水文专业委员会.中国铁路自然灾害及防治[M].北京:中国铁道出版社,2007.6重印.
  • 4青海省地质环境监测总站.青海省湟源县地质灾害调查与区划报告[R].2005年9月.
  • 5青海省地质环境监测总站.西宁市区地质灾害调查与防治区划报告[R].2002年3月.

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部