摘要
通过地震机制解、断裂构造分析及外围实测资料研究,确定了工程区域主应力场方向,并用于指导隧洞设计选线,具有重要工程意义。
Based on the earthquake focal mechanism solutions,fracture structural analysis,and external research,the principal geostress direction was determined of project region,and used to guide the design of tunnel alignment has important engineering significance.
出处
《吉林水利》
2009年第12期12-16,共5页
Jilin Water Resources
关键词
震源机制解
地应力
断裂
水压致裂
孔壁崩落
earthquake focal mechanism solutions,geostress,fault,hydraulic fracturing method,hole wall caving