南水北调中线工程超大口径PCCP外载试验研究 被引量:5

External load test on super-diameter pre-stressed concrete cylinder pipe(PCCP) in Mid-route of South-to-North Water Transfer Project
下载PDF
导出
摘要 采用原型现场试验的方法,分析了南水北调中线工程PCCP管道的外载试验方法、破坏特征和承载机理。制订了试件成型与测量方案,得到外载试验的具体过程、试验破坏特征以及开裂荷载,最后基于试验现象与试验结果分析了PCCP管的破坏位置,即裂缝出现在管顶与管底的内侧管芯混凝土和管侧的砂浆保护层,裂缝出现后迅速沿管身贯通,裂宽增加,裂缝条数稳定。试验为超大口径PCCP管道的生产、施工积累了经验,为制订超大口径PCCP管道标准以及质量验收标准提供依据。 Based on the in-situ prototype test, the method for the test on the external load, failure features and loading mechanism of PCCP pipeline in the Mid-route of South-to-North Water Transfer Project is analyzed herein, and then the scheme for the moulding and measurement of the test-piece is constituted as well; from which the specific process of the external load test, the feature of the testing failure and the cracking mechanism are obtained. Finally, the failure location on PCCP is analyzed in accordance with the testing phenomena and the test result. The test not only provides the experiences for the manufacture and construction of the super-diameter PCCP pipeline, but also lays a basis for making the relevant criteria.
出处 《水利水电技术》 CSCD 北大核心 2009年第12期31-33,51,共4页 Water Resources and Hydropower Engineering
基金 国家"十一五"支撑计划(2006BAB04A04-01) 国家自然科学基金项目(50879048)
关键词 预应力钢筒混凝土管(PCCP) 外载试验 破环特征 南水北调中线工程 pre-stressed concrete cylinder pipe (PCCP) external load test failure feature Mid-route of South-to-North Water Transfer Project
  • 相关文献

同被引文献52

引证文献5

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部