摘要 结合某600 MW机组大型火力发电厂主厂房采用预应力混凝土管桩进行地基处理的工程实例,介绍了预应力混凝土管桩在具有一定厚度砂夹层的地质条件下的适用性、可行性及对施工机械的要求.试桩及工程桩的施工与检测结果表明,对于类似于本工程且具有一定厚度砂夹层的地质条件,采用预应力混凝土管桩是可行的,有关工程经验可供类似工程和国内同行借鉴与参考. According to an engineering example of applying prestressed concrete pipe piles for foundation treatment to the main powerhouse in a certain 600 MW thermal power plant, the applicability, feasibility and demand for construction machinery of prestressed concrete pipe piles, are described; in the geological conditions containing sand laminae with certain thickness. Based on construction and test results of test piles and engineering piles, applying prestressed concrete pipe piles to geological conditions similar to that mentioned is available; and relevant engineering experience can provide reference for designers involved in similar projects.
作者 刘菊
出处 《武汉大学学报(工学版)》 CAS CSCD 北大核心 2009年第6期789-794,共6页 Engineering Journal of Wuhan University
关键词 地基处理 预应力混凝土管桩 单桩竖向极限承载力标准值 foundation treatment prestressed concrete pipe piles ultimate vertical bearing capacity of a single pile
  • 相关文献

参考文献7

二级参考文献8

  • 1GB13476-1999先张法预应力混凝土管桩[S].北京:中国标准设计出版社,1999.
  • 2建材行业03SG409国家建筑标准设计图集《预应力混凝土管桩》[S].北京:中国建筑标准设计出版社,1999.
  • 3JISA5337:日本工业标准.1995先张法预应力离心混凝土管桩[S].
  • 4[1]JGJ 94-94,建筑桩基技术规范[S].
  • 5刘金励,桩基工程技术,1996年
  • 6GB50010--2002混凝土结构设计规范[S].北京:中国建筑工业出版社,2002.
  • 7JGJ94-94建筑桩基技术规范[S].北京:中国建筑工业出版社,1994.
  • 8张剑锋,黄金忠,高倚山.上海外高桥电厂(一期)岩土工程勘察和工程试桩实录[J].电力勘测设计,1997,9(4):22-34. 被引量:1