摘要
上海市轨道交通2、10号线南京东路站为"厅—厅"通道换乘,介绍了10号线车站建筑的组成、车站总平面、站厅层、站台层、设备层、换乘通道以及车站附属建筑的设计分析。
The transfer of Shanghai Rail Transit Line 2 and Line 10 is through a passage connecting two concourses at the East Nanjing Road Station.It introduces the East Nanjing Road Station of the Line 10 from the aspects of architectural composition,station general plan,concourse layer,platform layer,equipment layer,transfer passage and the other affiliated buildings.
出处
《地下工程与隧道》
2009年第4期46-49,共4页
Underground Engineering and Tunnels