摘要
通过研究核电工程进度体系特点,探讨核电工程设计进度管理方法及控制要点,以及如何通过P3E/c实现核电设计赢得值管理。
By studying the characteristics of nuclear power engineering progress of the system, to explore the progress of nuclear power engineering management methods and control points, and how to use p3e/c to achieve the earned value management of nuclear power design.
出处
《科技信息》
2009年第33期I0327-I0327,I0323,共2页
Science & Technology Information
关键词
核电工程
设计进度
赢得值
Nuclear power engineering
Design schedule
Earned value