NLP与GA在煤矿开采进度计划中的比较应用

The comparison Between NLP and GA used in Optimizing the Project Scheduling in Coal Mining
下载PDF
导出
摘要 本文运用非线性规划(NLP)和遗传算法(GA)在网络图优化的基础上,以净现值NPV(Net Present Value)最大化作为进度安排目标,分别对平安五矿己二采区首采面开工的进度计划进行二次优化控制。结果表明本文提出的GA要优于NLP并且优化后净现值比NLP多60000元。 In this paper, non-linear programming (NLP)and genetic algorithm (GA) are used in optimizing the project scheduling of the second region of the first coal face of the fifth Ping’an Coa of which the objective is the maximal NPV (Net Present Value)l. The optimizing results show that GA is better than NLP and the NPV based on optimized operations is more than NLP 60000 RMB.
出处 《微计算机信息》 2009年第33期41-42,40,共3页 Control & Automation
基金 基金申请人:诸克军 项目名称:石油储层预测软硬件计算的理论与方法研究 基金颁发部门:国家自然科学基金委(70573101)
关键词 工序管理 净现值 煤矿开采 GA NLP process management net present value coal mining GA NLP
  • 相关文献

参考文献6

二级参考文献35

  • 1桂超,汪波.基于遗传算法的最短路径路由优化算法[J].微计算机信息,2005,21(12Z):193-195. 被引量:14
  • 2玄光男 程润伟.遗传算法与工程设计[M].北京:科学出版社,2000..
  • 3Russell A H. Cash flows in networks[J]. Management Science, 1970,16(5) :357 ~ 373.
  • 4Grinold R C. The payment scheduling problem [J]. Naval Research Logistics Quarterly, 1972,19(1): 123 ~ 136.
  • 5Elmaghraby S E, Herroelen W. The scheduling of activities to maximize the net present value of projects [J]. European Journal of Operational Research, 1990,49: 35 ~ 49.
  • 6Herroelen W, Gallens E. Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects[J]. European Journal of Operational Research, 1993,65: 274 ~ 277.
  • 7Demuelemeester E, Herroelen W, Van D P. An optimal recursive search procedure for the deterministic unconstrained max-npv project scheduling problem. Technical Report, Katholieke University, 1996.
  • 8Sepil C, Kazaz B. Project scheduling with discounted cash flows and progress payments. Working Paper, Middle East Technical University,1994.
  • 9Smith-Daniels D E. Summary measures for predicting the net present value of a project. Working Paper, College of St. Thomas, 1986.
  • 10Buss A H, Rosenblatt M J. Activity delay in stochastic project networks. Working Paper, Washington University, 1993.

共引文献110

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部