小湾水电站坝肩抗力体爆破试验 被引量:1

The Dam Abutment Force-resisting Mass Blasting Test in Construction of the Xaowan Hydropower Project
下载PDF
导出
摘要 小湾水电站坝肩抗力体地下洞(井)塞开挖爆破均是在缺陷岩体中进行,在爆破开挖施工过程中,支护、回填灌浆、衬砌(回填)混凝土等工序与开挖爆破交替进行。为避免爆破对其它工序造成影响,保证施工安全,必须要进行相应的爆破试验和安全监测,通过对试验及监测成果数据分析,优选爆破方案。 Excavation blasting of the underground cavern(shaft) plugs located in the dam abutment force - resisting masses was al/carried out within defected rock masses in construction of he Xiaowan hydropower project. In the course of blasting and excavation supporting work, backfill grouting, lining(backfilling) and concrete placement were performed al- ternatively. In order to avoid any adverse influence caused by blasting on the working procedure and ensure construction safety corresponding blasting test and safety monitoring were done. The optimum blasting alternative was selected based on the test and monitoring results.
作者 张迪 赵颖
出处 《云南水力发电》 2009年第6期20-23,共4页 Yunnan Water Power
关键词 小湾水电站 坝肩抗力体 地下洞(井)塞 爆破试验 Xiaowan Hydropower Project dam abutment force- resisting mass underground cavern(shaft) plug
  • 相关文献

同被引文献8

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部